Issue |
Title |
No 2 (2021) |
CONTROL OF THE HEATING CABLE OPERATION BASED ON A MATHEMATICAL MODEL OF HEAT AND MASS TRANSFER PROCESSES IN AN OIL WELL |
|
Kostarev N.A., Trufanova N.M. |
No 3 (2021) |
POWER CABLE INSULATION PRODUCTION LINE CONTROL |
|
Diatlov I.Y., Trufanova N.M. |
No 1 (2016) |
Modeling of technological plastic metal hot-forming of a large size ingot |
|
Rogovoi A.A., Salikhova N.K. |
No 2 (2023) |
Decision support system for power cable insulation vulcanization production line management |
|
Dyatlov I.Y. |
No 4 (2017) |
SYSTEMATIC APPROACH TO THE OPTIMIZATION OF NON-AUTOCLAVED AERATED CONCRETE PRODUCTION TECHNOLOGICAL PROCESS |
|
Kurzanov A.D., Leont’ev S.V. |
No 2 (2018) |
Optimization of production of construction materials assortment based on system engineering methods |
|
Krivogina D.N. |
1 - 6 of 6 Items |
|