Issue |
Title |
Vol 10, No 4 (2019) |
ASSESSMENT OF THE GEOMETRIC PARAMETERS OF THE ROAD USING A MOBILE ROAD LABORATORY |
|
Korenevsky V.V., Mordik E.A. |
Vol 14, No 4 (2023) |
Calculation of the temperature condition of a thermostabilizable base with a single pile |
|
Zhaysambaev E.A., Maltseva T.V., Kraev A.N. |
Vol 13, No 2 (2022) |
COMPUTER SIMULATION OF RIGID PLATE SETTLEMENT ON A HOMOGENEOUS WEIGHT BASE |
|
Bartolomey L.A., Bogomolova O.A., Geidt V.D., Geidt A.V. |
Vol 12, No 1 (2021) |
CALCULATION OF THE BEARING CAPACITY OF A TWO-SLOT STRIP FOUNDATION |
|
Bogomolova O.A. |
Vol 11, No 3 (2020) |
ENHANCEMENT OF MICROCLIMATE SUPPORT SYSTEMS IN POTATO STORE BUILDINGS |
|
Kalashnikov M.P. |
Vol 11, No 2 (2020) |
THE ANALYTICAL DETERMINATION OF THE PARAMETERS OF THE WELL WHILE ELIMINATING UNEQUAL SETTLEMENT OF FOUNDATIONS METHOD OF DRILLING-OUT OF THE SOIL |
|
Pronosin Y.A., Kaygorodov M.D., Karaulov A.M. |
Vol 9, No 1 (2018) |
THE INFLUENCE OF HORIZONTAL UNDERGROUND TUNNELS, ORIENTED PARALLEL TO THE FRONT OF THE UNIFORM SLOPE, ON ITS STABILITY |
|
Bogomolov A.N., Abramov G.A., Bogomolova O.A., Pristanskov A.A., Ermakov O.V. |
Vol 8, No 4 (2017) |
DEVELOPMENT OF WORK EXECUTION DESIGN FOR CONSTRUCTION OF PILE FOUNDATIONS IN CONSTRAINED CITY CONDITIONS |
|
Gaido A.N. |
Vol 8, No 4 (2017) |
EFFECTIVE METHOD OF DETERMINING THE PARAMETERS OF THE NON-LINEAR SOIL MODEL FROM IN-SITU TEST DATA |
|
Alekhin A.N., Alekhin A.A. |
Vol 8, No 2 (2017) |
PROBLEMS OF CLIMATE UNITS OF COMMUNICATION AND TELECOMMUNICATIONS CENTRES |
|
Nechaeva A.A., Burkov A.I., Mishneva G.S. |
1 - 10 of 10 Items |
|