Issue |
Title |
No 11 (2014) |
RESEARCH IN THE PROCESS OF HEAT AND MASS EXCHANGE IN MINE OPENINGS USING THE SYSTEMS OF PARTIAL AIR REUSE |
|
Zaitsev A.V., Kliukin I.A., Kiriakov A.S. |
No 13 (2014) |
Opyt sozdaniya i postroeniya semeystva sektsionnykh shakhtnykh lokomotivov |
|
Ziborov K.A., Protsiv V.V., Shlyakhov E.M. |
Vol 15, No 20 (2016) |
STUDY OF GEOLOGICAL AND TECHNOLOGICAL MODEL OF COMPLEX RESERVOIRS OF SAMOTLOR FIELD OIL AND GAS DEPOSITS |
|
Chusovitin A.A., Timchuk A.S., Grachev S.I. |
No 18 (2016) |
Geomechanical Justification of the Application of Concave-Flat Shape of Mine Excavation Stope Face to Control Sudden Rock Spelling |
|
Andreiko S.S. |
Vol 16, No 3 (2017) |
Parameters of preventive gas removal from mine Bedrocks during the layer mining of the third potash formation at mines of Belaruskali JSC |
|
Andreyko S.S., Lukyanets E.V., Litvinovskaya N.A., Nesterov E.A., Bobrov D.A., Polyakov A.L., Lutovich E.A. |
Vol 24, No 3 (2024) |
Validation of the Heat and Mass Transfer Model in the Atmosphere of a Horizontal Mine Working in the Presence of an Intense Heating Source |
|
Levin L.Y., Semin M.A., Popov M.D., Zhikharev S.Y. |
Vol 22, No 1 (2022) |
Drying of Potassium Mine Workings Using Automatic Air Control Systems |
|
Zaitsev A.V., Ageeva K.M. |
1 - 7 of 7 Items |
|