Issue |
Title |
Vol 10, No 3 (2019) |
TO THE QUESTION OF THE USE OF COQUINA IN CONSTRUCTION |
|
Bolotin A.V., Lunegova A.A., Zhukova G.G., Ovsyannikova D.N. |
Vol 7, No 4 (2016) |
NUMERICAL RESEARCHES STRESS-STRAIN STATE AND DISPLACEMENTS OF PILE FOUNDATIONS WITH REMOTE CENTRAL PILE |
|
Malyshkin A.P., Esipov A.V. |
Vol 14, No 1 (2023) |
The use of foam glass to protect the degrading permafrost soils |
|
Nikiforova N.S., Konnov A.V. |
Vol 12, No 4 (2021) |
DIRECTIONS OF TRANSFORMATION OF ENERGY SUPPLY SYSTEMS TAKING INTO ACCOUNT THE PROSPECTIVE DEVELOPMENT OF TERRITORIES |
|
Beloglazova T.N., Romanova T.N. |
Vol 10, No 3 (2019) |
PROBLEMS OF IRREGULAR UNCONTROLLED EMERSION OF THE UNDERGROUND PARKING IN THE SAINT PETERSBURG |
|
Gurskii A.V., Levintov G.V. |
Vol 12, No 4 (2021) |
CALCULATION OF THE «BASE - EMBANKMENT» SYSTEM STABILITY |
|
Bogomolova O.A., Zhidelev A.V. |
Vol 10, No 2 (2019) |
WATER SUPPLY AND SEWERAGE OF MULTIFUNCTIONAL COMPLEXES |
|
Bartova L.V., Bushmakina N.V., Petukhova E.O. |
Vol 11, No 3 (2020) |
SEASONAL CHANGES IN THE VALUE OF THE RESISTANCE COEFFICIENT OF THE LANDSLEND |
|
Bogomolova O.A., Zhidelev A.V. |
Vol 11, No 3 (2020) |
CALCULATION OF VERTICAL DEFORMATIONS OF THE FOUNDATIONS ON THE SOFT SOIL IMPROVED BY GEOTEXTILE ENCASED STONE COLUMNS |
|
Shenkman R.I., Ponomaryov A.B. |
Vol 9, No 4 (2018) |
COMPARATIVE ANALYSIS OF EXISTING METHODS FOR CALCULATING FROZEN WALL THICKNESS FOR MINE SHAFTS UNDER CONSTRUCTION |
|
Levin L.Y., Semin M.A., Plekhov O.A. |
Vol 9, No 3 (2018) |
STUDY OF THE LARGE-SCALE BORED PILES ON THE HORIZONTAL LOAD AND THEIR CALCULATION |
|
Gotman A.L., Gaisin A.Z. |
Vol 8, No 3 (2017) |
INTEGRATED TECHNOLOGY OF GEOTECHNICAL SURVEY |
|
Boldyrev G.G., Barvashov V.A., Idrisov I.K., Khrianina O.V. |
Vol 7, No 4 (2016) |
Numerical study load distribution between piles in groups |
|
Malyshkin A.P., Esipov A.V. |
Vol 10, No 3 (2019) |
THEORY AND CALCULATION OF ROAD BRIDGES BURIED ABUTMENTS BASES |
|
Shapiro D.M. |
1 - 14 of 14 Items |
|