Issue |
Title |
No 2 (2021) |
APPLYING NEURAL NETWORK MODELS TO THE CONSTRUCTION OF PRODUCTION RULES EXPERT SYSTEMS |
|
Pogodaev A.K., Khabibullina E.L., Inyutin D.M. |
No 2 (2018) |
Optimization of production of construction materials assortment based on system engineering methods |
|
Krivogina D.N. |
No 1 (2021) |
MODELS AND ALGORITHMS TO CONTROL THE SELECTION OF RELIEF VALVES FOR CHEMICAL PRODUCTION EQUIPMENT |
|
Nikolin A.V., Moshev E.R. |
No 3 (2015) |
Models of multicriteria selection for production scheduling |
|
Chimbur I.V., Vozhakov A.V. |
No 4 (2017) |
SYSTEMATIC APPROACH TO THE OPTIMIZATION OF NON-AUTOCLAVED AERATED CONCRETE PRODUCTION TECHNOLOGICAL PROCESS |
|
Kurzanov A.D., Leont’ev S.V. |
No 2 (2021) |
THE METHOD OF AUTOMATICLY GENERATED EFFECTS OF EVENT-BASED GAME MECHANICS IN THE FRAMEWORK OF A CORPORATE E-LEARNING SYSTEM |
|
Loginov K.V. |
No 2 (2015) |
Method of customizing genetic algorithm for line production planning problem |
|
Rozenkov K.G., Fedoseev S.A., Vdovichenko A.A. |
No 1 (2018) |
Operational enterprise resource planning wich using by the knowledge base and the fuzzy prefernces |
|
Vozhakov A.V. |
No 2 (2015) |
Development intelligent control system of industrial company based on open interface model |
|
Vozhakov A.V., Danilov A.N. |
No 4 (2021) |
IDENTIFICATION OF THE POTENTIAL OF CLUSTER-NETWORK INTERACTION OF ORGANIZATIONS BASED ON ESTABLISHING A LINK BETWEEN GRP AND MARKET CONCENTRATION INDICATORS |
|
Kozhemyakin L.V., Yasnitsky L.N., Rusakov S.V. |
No 1 (2015) |
Customer attractiveness assessment of the commercial reasl estate items using matrix methods of integrated assessment |
|
Martirosian N.O., Tabunkin I.G. |
No 3 (2019) |
OPERATIONAL EVALUATION OF THE PROBABILITY OF PERFORMANCE OF THE ORDER IN THE CONDITION OF UNCERTAINTY OF CONSUMER DEMAND |
|
Tolstobrov D.A. |
No 2 (2023) |
The concept of intelligent control system of small-scale production |
|
Vozhakov A.V., Stolbov V.Y. |
No 4 (2019) |
MODELLING THE QUALITY AND PRODUCTION OF PETROLEUM PRODUCTS WITH MATLAB |
|
Zatonskiy A.V., Tugashova L.G. |
No 1 (2023) |
A method for constructing non-elementary Cobb – Douglas production functions |
|
Bazilevskiy M.P. |
No 1 (2020) |
TECHNO-HUMANITARIAN VIEW ON PROBLEMs OF PROJECTIVE MANAGEMENT IN SOCIO-ECONOMIC SYSTEMS |
|
Kharitonov V.A., Krivogina D.N., Spirina V.S., Salamatina A.S. |
No 1 (2023) |
Application of neuro-fuzzy systems technology for control the density of asphalt concrete mixtures in the paving process |
|
Prokopev A.P. |
No 1 (2020) |
CONTROL OF A COMPLEX OBJECTS, STATES OF WHICH ARE DESCRIBING BY THE MATRIX RATING MECHANISM |
|
Alekseev A.O. |
No 4 (2022) |
MATHEMATICAL MODELING OF PREEMPTIVE MANAGEMENT BY THE STAGES COMPLEX OF ADMINISTRATIVE PRODUCTION |
|
Mironov A.Y., Mironova A.Y., Burlov V.G. |
No 2 (2020) |
COMPENSATION PLAN SIMULATION MODELING CONSIDERING DIFFERENT RANDOM QUANTITY DISTRIBUTIONS |
|
Shil’nikov A.S., Mitsel’ A.A. |
No 4 (2022) |
NUMERICAL CALCULATION OF HEAT TRANSFER IN A MULTILAYER COMPOSITE STRUCTURE WITH HONEYCOMB FILLER DURING AUTOCLAVE MOLDING AT THE HEATING STAGE |
|
Karakulina E.O., Tugov V.V. |
No 2 (2020) |
METHODS FOR PRESENTING PETRI NETS MODELING RESULTS OF PRODUCTION SYSTEMS |
|
Sochnev A.N. |
No 2 (2016) |
Synchronized small-scale production management system |
|
Vozhakov A.V. |
No 3 (2020) |
CONCEPTUAL MODEL OF HUMAN RESOURCES MANAGEMENT AND PROJECT MANAGEMENT FOR AN SOFTWARE DEVELOPMENT |
|
Chugunov A.P. |
No 4 (2016) |
NETWORK-CENTRIC ASPECTS OF MODERN PRODUCTION MANAGEMENT STRATEGIES |
|
Fedoseev S.A. |
1 - 25 of 25 Items |
|