Issue |
Title |
Vol 19, No 3 (2019) |
AUTOMATION OF PRODUCTION PROCESSES WHILE CREATING ANNUAL MINING DEVELOPMENT PLANS |
|
Kutovoi S.N., Kataev A.V., Efimov E.M., Overin A.V. |
Vol 21, No 3 (2021) |
Surveying Tasks Solution Automation in the Framework of Mining and Geological Information System Creation at PJSC "Uralkali" |
|
Kutovoy S.N., Kataev A.V., Vasenin D.A., Batalov I.A., Svintsov D.I. |
Vol 21, No 2 (2021) |
Analysis of the Dependence between Acoustic and Physico-Mechanical Properties of Terrigenic Rocks |
|
Petrakov D.G., Penkov G.M., Solomoychenko D.A. |
Vol 19, No 4 (2019) |
ANALYSIS OF DATA FOR THE GEOLOGICAL MODELING STRATA OF THE VKDPS |
|
Kataev A.V., Kutovoy S.N., Meyster D.A., Efimov E.M., Rachkova A.P. |
Vol 20, No 3 (2020) |
Analysis of Conceptual Engineering Tools Application of in Assets Arrangement System Designing |
|
Kelberg K.E., Lyadova N.A. |
Vol 20, No 1 (2020) |
STUDY OF THE RELATIONSHIPS BETWEEN PHYSICAL AND MECHANICAL PROPERTIES OF THE SANDSTONE AND VELOCITY OF ELASTIC WAVES |
|
Penkov G.M., Karmanskiy D.A., Petrakov D.G. |
Vol 16, No 2 (2017) |
WORK EXPERIENCE ON AUTOMATION OF PROCESSING OF SURVEY MEASUREMENTS OF BACKFILL OF MINES OF URALKALI PJSC |
|
Kutovoi S.N., Kataev A.V., Vasenin D.A., Efimov E.M. |
No 11 (2014) |
SIMULATION OF STRESS-DEFORMED STATE OF OPEN WELL |
|
Ashikhmin S.G., Kukhtinskii A.E. |
Vol 24, No 1 (2024) |
Determination of Clayey Reservoir Rock Properties at Various Stages of Oil Field Development |
|
Karmanskiy D.A., Petrakov D.G. |
Vol 22, No 3 (2022) |
Analysis and preparation of initial data for building a geological and geomechanical model of the area at the Verkhnekamskoye potassium-magnesium salt deposit |
|
Lebedeva O.O. |
1 - 10 of 10 Items |
|