Issue |
Title |
No 3 (2014) |
ABOUT THE TASKS OF THE RESEARCH ADAPTIVE CONTROL POWER STATIONS BASED ON CONVERTED AVIASPACE MICROTURBINES |
|
Kavalerov B.V., Bahirev I.V., Kilin G.A., Matalasova E.A. |
No 36 (2020) |
SOLUTION OF THE PROBLEM OF OPTIMAL POWER DISTRIBUTION OF INDIVIDUAL COMPENSATING DEVICES FOR A GROUP OF ASYNCHRONOUS MOTORS FOR A STABLE OPERATING MODE AND FOR A GRINDLY VARIABLE LOAD |
|
Tumaeva E.V., Kuzin S.S., Aflyatunov I.F., Makuseva T.G. |
No 15 (2015) |
HEURISTIC ALGORITHM FOR THE MICROGRID POWER OPTIMIZATION |
|
Kichkin A.V., Chudinov A.V. |
No 36 (2020) |
THERMAL FIELD MODELING OF THE ELECTRON BEAM WELDING PROCESS WITH DYNAMICALLY VARIABLE PARAMETERS OF PRODUCT’S ALLOYS |
|
Kurashkin S.O., Tynchenko V.S., Murygin A.V., Rogova D.V. |
No 4 (2015) |
DEVELOPMENT OF WAREHOUSE MANAGEMENT SYSTEMS |
|
Chukhlantsev E.S., Maksimova V.V. |
No 36 (2020) |
OPTIMIZATION OF NEURAL NETWORK COMPUTATION |
|
Akhmetzyanov K.R., Tur A.I., Kokoulin A.N., Yuzhakov A.A. |
No 20 (2016) |
IMPROVING ECONOMIC EFFICIENCY THROUGH STRUCTURAL OPTIMIZATION |
|
Tarutin A.V., Trofimenko A.O. |
No 39 (2021) |
CURRENT TRENDS IN DEVELOPMENT OF AUTOMATIC EXCITATION CONTROL SYSTEMS OF SYNCHRONOUS GENERATORS OF POWER PLANTS |
|
Askarov A.B., Andreev M.V., Chikishev E.M., Suvorov A.A., Rudnik V.E. |
No 28 (2018) |
OPTIMAL TWO-PHASE PULSE-WIDTH MODULATION |
|
Belousov I.V., Samoseiko V.F. |
No 29 (2019) |
NEW METHOD FOR INCREASE OF ANTI-JAMMING STABILITY OF GPS NAVIGATION SYSTEMS |
|
Abdulov R.N., Asadov H.H. |
No 30 (2019) |
OPTIMIZATION OF THE MILLLOAD DEGREE IN CEMENTPRODUCTION |
|
Kazarinov L.S., Khasanov J.R. |
No 30 (2019) |
DISTRIBUTED CONTROL IN THE TASK OF MODELING OF POPULATION DIFFERENTIATION BY THE AMOUNT OF SAVINGS |
|
Pervadchuk V.P., Vladimirova D.B., Derevyankina P.O. |
No 2 (2014) |
OPTIMIZING SELECTION OF CONTROLLED REACTIVE POWER COMPENSATION SYSTEMS FOR JSC «URICM » |
|
Romodin A.V., Leyzgold K.A., Trushnikov K.P. |
No 32 (2019) |
QUESTIONS ON PROVIDING EFFECTIVENESS OF LASER COMMUNICATION BETWEEN NODES OF DISTRIBUTED MEASUREMENTS NETWORKS |
|
Kazimli R.V., Huseynova R.O. |
No 2 (2014) |
SOLUTION OF THE ORTHOGONAL PACKING OF SHEET MATERIALS BY LINEAR CUTTING |
|
Faizrakhmanov R.A., Murzakaev R.T., Shilov V.S., Mezentsev A.S. |
No 34 (2020) |
INTERNAL-PROJECT CONTRADICTIONS AGREEMENT MECHANISMS UPON CARRYING OUT REPAIR AND REMEDIAL WORKS DRAWING UP PLANS AND THEIR COMPOSITIONS |
|
Safonov N.I., Kharitonov V.A. |
No 3 (2014) |
THE HIL MICROGRID POWER OPTIMIZATION |
|
Kichkin A.V., Chudinov A.V. |
No 35 (2020) |
METHOD OF LINEARIZATIONAL OPTIMIZATION OF HOLONOMIC INFORMATION-MEASURING AND MECHATRONIC SYSTEMS |
|
Asadov H.H., Abdullayev S.N., Tarverdiyeva U.H. |
1 - 18 of 18 Items |
|