Issue |
Title |
Vol 21, No 1 (2021) |
Study of Gas Wells Operation Regimes in Complicated Conditions |
|
Popov M.A., Petrakov D.G. |
Vol 20, No 4 (2020) |
Assessment of the Uncertainty Parameters Influence on the Development Indicators Forecasting |
|
Kozyrev N.D., Vishnyakov A.Y., Putilov I.S. |
No 5 (2012) |
Increase productivity of construction in sidetrack of Verkhnekamsk potassium-magnesium salts field |
|
Ust'kachkincev E.N. |
Vol 19, No 4 (2019) |
OPPORTUNITIES OF OPERATIONAL CONTROL OF RESIDUAL RECOVERABLE RESERVES AT DIFFERENT STAGES OF OIL PRODUCTION OBJECTS DEVELOPMENT |
|
Galkin S.V., Poplaukhina T.B., Luzina N.G., Lobanov D.S., Emashov R.I. |
Vol 20, No 2 (2020) |
IMPROVEMENT OF THE EFFICIENCY OF CYCLIC STEAM STIMULATION OF WELLS IN THE UPPER PERMIAN DEPOSIT OF THE USINSKOYE FIELD BASED ON THE HYDRODYNAMIC MODEL |
|
Savchik M.B., Ganeeva D.V., Raspopov A.V. |
Vol 18, No 2 (2018) |
A procedure for evaluation of the effect of water injection into a reservoir on oil production on example of Tournaisian deposits of the Sosnovskoe gas-oil field |
|
Fadeev A.P. |
Vol 18, No 1 (2018) |
THE EXPERIMENTAL STUDY OF MICROCLIMATIC CONDITIONS AND FACTORS OF THEIR FORMATION IN THE OIL MINE |
|
Klyukin Y.A., Semin M.A., Zaitsev A.V. |
Vol 20, No 1 (2020) |
IMPROVEMENT OF THE EFFECTIVENESS OF GAS-OIL (OIL-GAS) RESERVOIRS ENGINEERING BY SELECTING RATIONAL DESIGN FOR PERM REGION FIELDS |
|
Goncharova O.R., Kozlov S.V. |
Vol 17, No 1 (2018) |
Development of probabilistic and statistical models for evaluation of the effectiveness of proppant hydraulic fracturing (on example of the Tl-Bb reservoir of the Batyrbayskoe field) |
|
Galkin V.I., Ponomareva I.N., Koltyrin A.N. |
Vol 20, No 3 (2020) |
Waterflooding Efficiency Evaluation on Tournasian-Famennian Deposit of Magovskoye Field |
|
Lyadova N.A., Demchenko V.A. |
Vol 19, No 3 (2019) |
FORECAST ASSESSMENT OF EFFICIENCY OF RADIAL DRILLING TECHNOLOGY FOR TOURNEISIAN OPERATING OBJECTS OF THE PLATFORM PART OF THE PERM REGION |
|
Kochnev A.A., Galkin S.V. |
No 19 (2016) |
Study of Oil Recovery from Reservoirs of Different Void Types with Use of Multidimensional Statistical Analysis |
|
Galkin V.I., Ponomareva I.N., Repina V.A. |
Vol 21, No 4 (2021) |
Methodological Problems of Assessing Occupational Hazards at Mining Enterprises and Their Solution |
|
Cherny K.A., Fainburg G.Z., Rosenfeld E.A. |
Vol 16, No 4 (2017) |
Relevant directions in development of polymer compositions for conditions of operated in Perm Region reservoirs |
|
Ketova Y.A. |
Vol 21, No 2 (2021) |
Determination of the Minimum Measures in the Well to Prevent the Formation of Asphalt-Resin-Paraffin Deposits |
|
Mitroshin A.V. |
Vol 16, No 2 (2017) |
HOW TO CONSIDER ROCK DENSITY IN FLUID FLOW MODEL OF OIL FIELDS DURING PERMEABILITY MODELLING |
|
Repina V.A. |
Vol 20, No 4 (2020) |
Application of Integrated Modeling in the Oil and Gas Industry |
|
Filippov E.V., Chumakov G.N., Ponomareva I.N., Martyushev D.A. |
Vol 16, No 1 (2017) |
Analysis and justification of selection of fluids to be used for water shut-off treatment during well completion |
|
Dvoynikov M.V., Nutskova M.V., Kuchin V.N. |
Vol 20, No 2 (2020) |
A PRACTICE OF DEVELOPMENT OF PERM KRAI FIELDS WITH HORIZONTAL WELLS |
|
Zaitcev R.A., Raspopov A.V. |
Vol 18, No 2 (2018) |
Evaluation of the wave effect effectiveness in carbonate reservoirs with high viscosity oil |
|
Poplygin V.V., Wiercigroch M. |
Vol 24, No 1 (2024) |
Modern Methods of Using Machine Learning as a Tool for Oil Production Forecasting |
|
Rustamov A.R., Penkov G.M., Petrakov D.G., Rustamova M.A. |
Vol 23, No 4 (2023) |
Patterns of Roof and Soil Convergence in Development Workings during Coal Seams Mining in Seismically Hazardous Areas of Kuzbass |
|
Isachenko R.A., Koryaga M.G. |
Vol 23, No 4 (2023) |
Using the Results of Differentiation and Grouping of Deposits to Solve the Problems of Developing Carbonate Reservoirs in the Volga-Ural Oil and Gas Province |
|
Gilyazetdinov R.A., Mukhametshin V.V., Kuleshova L.S. |
Vol 22, No 2 (2022) |
Improving the efficiency of the Pavlovskoye field development through the reconstruction of wells by drilling sidetracks (on the example of object T) |
|
Ivshin A.V., Ustinov A.A. |
Vol 22, No 1 (2022) |
Determination of the Optimum Scheme for the Development of the Tolumskoye Field using CO2 Injection |
|
Mardamshin R.R., Yaskin S.A., Stenkin A.V., Morozyuk O.A., Kordik K.E. |
1 - 25 of 25 Items |
|